From planning to the project
We plan, manufacture and assemble your new container. Möbus Umwelt GmbH in Stuttgart is your partner when it comes to settling basins on construction sites. We accompany your project from the first planning to the installation. We are happy to meet your individual wishes and requirements from the first idea to production. With more than 40 years of experience and support for construction sites in Germany, Austria and Switzerland, you can rely on us. If you are interested in a new sedimentation tank, send us your request now!
Plan settling tanks
Are you planning a dewatering and need settling tanks? We would be happy to plan the right solution with you. Together we will discuss the size, fittings and connections your container should have. Which dimensions are most economical and all official requirements are met. We work on all of these questions during the planning process. You are interested and want to realize your new construction site with us – then ask now!
INQUIRY
Get in touch with us and let us know your requirements and wishes.
OFFER
Get in touch with us and let us know your requirements and wishes.
PLANNING
Get in touch with us and let us know your requirements and wishes.
FINISHED
Get in touch with us and let us know your requirements and wishes.
Everything starts with careful planning
Our experienced team will work with you in project planning to create a production hall that is tailored to your needs. On the basis of your individual requirements, our experts calculate your steel hall with all static requirements for the building site. Then we discuss which roof and wall components you would like, produce the steel construction drawing and pass it on to our production team.
MÖBUS UMWELTSCHUTZ
Unsere Standardbecken zur Miete:
Absetzbecken 30m³
Ein Standard Absetz- oder Neutralisationsbecken voll ausgestattet mit Tauch- und Prallwänden. Durch sein Volumen von ca. 30m³ ist es ideal geeignet für größere Wasserhaltungen, Tiefbau und Tunnelbaustellen.
- 6.500 x 2.250 x 2.200 (L/B/H)
- Volumen ca. 30m³
- Auslaufflansch DN200
- Steig- und Prallwände
Absetzbecken 20m³
Unser Standard-Model, geeignet als Absetz oder Neutralisationsbecken, für Neutralisation, Wasserhaltung, Sedimentation oder HDW Strahlarbeiten.
- 5.500 x 2.000 x 2.000 (L/B/H)
- Volumen ca. 20m³
- Auslaufflansch DN200
- Steig- und Prallwände
Absetzbecken 10m³
Dieses Standardbecken ist ideal für eine kleine Wasserhaltung oder Arbeiten mit Hochdruckwasserstrahlen geeignet.
- 3.800 x 2.000 x 1.500 (L/B/H)
- Volumen ca. 10m³
- Auslaufflansch DN150 PN10/16
- Steig- und Prallwände
Settling basin 2.8cbm with outlet flange DN 100
Our smallest sedimentation basin with a volume of approx. 2.8cbm is ideally suited for no water retention and HDW blasting work.
- 2,000 x 1,200 x 1,400 (LxWxH)
- Volume approx. 2.8 cbm
- Outlet flange DN 100 PN10
- Risers and baffles
- RAL color freely selectable
MÖBUS UMWELTSCHUTZ
Becken mit Thomsonwehr
Absetzbecken 30m³ mit Thomsonwehr zur Durchflussmengenmessung
Absetz- oder Neutralisationsbecken 30m³ mit Thomsonwehr zur Durchflussmengenmessung
Ein Standard Absetz- oder Neutralisationsbecken ausgestattet mit zwei Tauchwänden, zwei Prallwänden und Thomsonwehr zur Bestimmung der Durchflussmenge.
- 6.500 x 2.200 x 2.200 (L/B/H)
- Volumen ca. 30m³
- Auslaufflansch DN200
- Freier Einlauf von oben
Absetzbecken 10m³ mit Thomsonwehr zur Durchflussmengenmessung
A standard settling or neutralisation tank fully equipped with submersible walls, impact walls and Thomson weir to determine the water quantity. With its volume of approx. 10m³ it is ideal for small water retention or HDW blasting work
- 3.800 x 2.000 x 1.500 (L/B/H)
- Volume ca. 10m³
- outlet flange DN150
- risers and impact walls
- Thomsonwehr
MÖBUS UMWELTSCHUTZ
Durchflussmessung mittels Thomsonwehr
Die Dreiecksform bewirkt, dass auch geringe Wassermengen noch sehrgenau gemessen werden können.
Becken mit Thomsonwehr sind in allen Größen erhältlich!
Credentials
ISCHGL / AUSTRIA 10 PIECES OF LOWERING BASIN A 30CBM
OBERVELLACH / AUSTRIA NEUTRALIZATION SYSTEM WITH LOWERING BASIN
PARTENEN / AUSTRIA NEUTRALIZATION SYSTEM WITH LOWERING BASIN
XXXX / AUSTRIA NEUTRALIZATION SYSTEM 30L / SEC WITH LOWERING BASIN
XXXXX / GERMANY NEUTRALIZATION SYSTEM 10L / SEC WITH LOWERING BASIN